新博官网平台

Set as Homepag | Collection | | China Site 

Home
Project Cooperation
 Industry Application  
1Biomass power generation 
2Glass kiln waste heat power generation 
3Cement kiln low temperature waste heat power generation 
4Waste heat recovery from electric smelting furnace 
5Ore hot stove afterheat electricity generation 
6CDQ Waste Heat Power Gengeration 
7Sintering Flue Gas Waste Heat Power Generation 
8Steel Converter Waste Heat Power Generation 
9Blast-furnace Gas Power Generation Project 
10Blast Furnace Excess Pressure Power Generation 
 Project Performance  
   Project Performance   

新博官网平台Project Performance


As of June 2011, my company implemented a pure low temperature waste heat power generation projects, coke oven gas power generation projects and biomass power projects total installed capacity of 171MW, Projects located in every corner of China,Engineering quality rate of 90% or more.

  Company in the waste heat power generation project implementation process, gained good economic benefits and social benefits, Access to the customer and the community wide acclaim, Implementation of client, company, society and other aspects of mutual benefit and win-win situation.
 

About Us | Qualification Reputation | Technical Force | Industry Application | Project performance | Solution | Contact Us
Copyright @ 2010-2012 huaxinenergy.cn Inc. All Rights Reserved Xian Huaxin New Energy CO.,LTD  
新博官网安卓下载 新博注册网址 新博官网合作 太阳新博官网平台城网址 太阳新博官网平台老品牌值得注册 澳门威尼斯人vn55 澳门威尼斯人新博官网平台 新博新博官网平台app 澳门威尼斯人新博官网平台网址 太阳新博官网平台老品牌